Several summary booth design experience

Addtime:2016-05-10 11:28:35

    Faced with increasingly tough competition in the market, more and more businesses choose to participate in exhibitions and other exhibitions ways to promote new products, open up new markets, but this development in foreign countries relatively mature industry in the country is an emerging industry, a lot of people do not know much of this, the author of the exhibition industry practitioners with nearly a decade of experience on some small experience for everyone to share, we want to help by reading this article:

    First, the exhibition range:
Shenzhen practitioners on himself exhibition company, the business scope is: Shenzhen, Hong Kong, Guangzhou, Dongguan, Huizhou, Zhongshan and Zhuhai special equipment exhibition design and construction, design and construction of exhibition halls, Showcase design, store design and decoration, Museum, History Museum, Museum of love plant design, corporate design planning exhibition activities, exhibition panels arranged in the main scaffolding, Beijing, Shanghai, Suzhou, Hangzhou, Xiamen, Chengdu, Changsha, Wuhan and other places places special booth decoration design, exhibition design decoration, display cabinets design, production build panels Chin supplement.
   
   Second, the process of exhibition services:
Many first time exhibitors exhibitors prone to a misunderstanding: that the only need a few days to find a professional exhibition company exhibition at the end of the story before carried out, the results of that time found ten have nine did not dare to undertake a project of this exhibit, If it is a small show, before and after the show in the exhibition season no other operations also slightly better, or even if ultimately there are very few companies to undertake expensive down, in fact, money can not buy back the time of final confirmation due to the design, purchase materials, production time is too tight only crudely, the effect is very unsatisfactory, and there is no way but to accept, the result is more money spent, but the effect is extremely poor, very passive.

   Normal processes are generally: initial design needs about a week, confirmed the need to modify the details of three or four days to sign the contract, issued by the construction drawings a week or so, the next single purchase of materials produced according to the booth size and complexity requires a minimum of two weeks or so, move site usually 2-3 days, and finally dismantling the entire time from design to completion generally exhibit booth about a half months to prepare, so initially operate sooner the better, the best stand down immediately start looking for a certain design companies. Often determine the sooner the more favorable price, prepare more fully, otherwise it will be very passive.

   Third, the production of exhibition design and construction works Price:
Exhibitors of course is the price the lower the better, in fact, often no good goods cheaper, when exhibitors spent a lot of effort to select the lowest price of a design company, to do something only to find out, because the price is too low to produce only cut corners or workmanship Unable to pay attention to rough poor quality, impact booth effect. This requires exhibitors looking for design and construction units when the need for a scientific and rational choice, choose from a comprehensive cost-effective ways, of course, if a start is not just pay attention to the quality of low-cost mentality is no such need, or is best able to accept the price level of the budget and quality requirements to inform designers scenario, if the price is too low it is unable to achieve the quality requirements of the design units can give up cooperation in advance, so you can save both time and avoid unpleasant situations occur.

    Fourth, copyright issues:
Design company design drawings are generally not allowed to theft, if not selected exhibitors make their company stand can not be unauthorized use of its program information line construction or other production company commissioned the construction, otherwise it will leave a great risk and even affect the company or cause Exhibitor great damage to the image (similar to the scene in recent years, common adverse effects of the situation, the General Assembly has some site-related intellectual property legal counsel and service), if do need to use other programs designed to work with rather than building construction, both sides need to negotiate and pay design reasonable cost, in order to avoid unpleasant late.
 
   Fifth, the exhibition dismantling
Closing time is generally scheduled during the exhibition on the last day in the afternoon, according to the organizers exhibitors generally specified time, the first exhibits to withdraw in order to avoid damage due to the dismantling of electricity power products, pay attention to safety during the dismantling, after the withdrawal of all the exhibits producers then stand removal work.